Optional step 0: Remove old V3 CLI, connectors, and integrations
If this VPS still has the old V3 CLI, connectors, OpenClaw integration, or Hermes memory provider installed, remove them before setting up the V4 skill:
curl -fsSL https://www.byterover.dev/uninstall-v3.sh | sh
This removes the old V3 command-line tools and connectors. It also removes the old OpenClaw integration and Hermes memory provider when they are detected. It does not replace the migration step for V3 memory data.
The agent starts ByteRover authentication and prints a browser URL. Open the URL, approve the request, then return to the VPS terminal and type approved when the agent asks.Authentication must finish before migration starts.
The agent checks the VPS for V3 projects, previews what will be migrated, then moves the V3 memory into V4 spaces.Each V3 project becomes a V4 space. The old markdown memory is converted into V4 topics.
Only cleanup after the V4 spaces are verified.Ask your agent:
cleanup v3 files after migration
The agent backs up the whole V3 .brv/ folder, then removes the original .brv/ from the project.By default, backups are stored in your Documents folder: